6 Page views
Published on Wed Jun 28 2023 | Construction World Union Ministry Of Housing And Urban Affairs Metro proposal as readied by the Rail India Technical and Economic Services (RITES) Chandigarh Mohali Panchkula Haryana Urban Development Authority Haryana Punjab Zirakpur Pinjore Sarangpur Panchkula ISBT Airport Chowk Manakpur Kallar Mansa Devi Complex Kharar Dadumajra
The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.
A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”
Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.
In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.
In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.
The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.
In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.
RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.
Delhi–Siliguri Bullet Train Announced: Via Lucknow, Varanasi And Patna, Travel Time To Drop From 20 Hours To 6
Delhi to Jewar Airport in 21 minutes: New RRTS corridor to link Noida Airport with Varanasi bullet train
L-G directs DDA to chart out plan to develop Dwarka into an international investment hub
New 10-Lane Delhi-Jewar Corridor Planned Ahead Of Noida Airport Launch
Now homeowners can file online complaint against builders for illegal transfer charges in Uttar Pradesh; Step-by-step guide on how to do it